Benjamin, M., Cayamanda, C., Belmonte, B., Tan, R., & Razon, L. (2016). A Risk-based Criticality Analysis in Bioenergy Parks using P-graph Method. Chemical Engineering Transactions, 52, 1243-1248. https://doi.org/10.3303/CET1652208