Wang, Z., Wang, W., Hu, C., & Liu, X. (2013). An Integrated Decision Model for Critical Component Spare Parts Ordering and Condition-based Replacement with Prognostic Information. Chemical Engineering Transactions, 33, 1063-1068. https://doi.org/10.3303/CET1333178